Joined prefab units installed for BFAR in Zamboanga

For contractors, engineers, government & plants

Site offices and barracks, planned for your project.

Field offices, crew quarters, toilets and dining areas — with a layout and itemized quotation your engineering and procurement teams can approve.

  • Multi-unit compounds
  • 2–3 storey layouts
  • Free installation

Project sites supplied for

  • Megawide
  • BFAR
  • SSBTC
  • MCC
  • One JMR
  • Phil Oasis Hotel
  • Cliff Mansion Resort
  • Northseas Food Corp
  • Manila Padel Club
  • Yuto Construction

Built for site work

Everything a project site needs, in one layout.

Field & engineering offices

Single 20ft offices or joined units for project managers, engineers and QA teams.

Crew barracks

Rows or 2–3 storey stacks with stairs and walkways, planned around headcount.

Toilets & dining

Toilet sets, sinks and covered dining areas laid out with the rest of the compound.

Guard houses & storage

Smaller units for gates, tool rooms and document storage.

Common questions from project teams

“Mura sa quotation, pero ang daming additional?”

Not here. The quotation separates unit, options, delivery and site preparation, so the number you approve is the number you plan for.

“Kaya ba sa site namin?”

Send your location and a few site photos. Access, unloading space and the base are checked before you order.

“Need namin ng specs for approval.”

Full specifications, layout sketch and a written scope you can forward to engineering and procurement.

“Multiple units, one contact?”

Yes. One point of contact from requirements to turnover, for one unit or a full compound.

Prefab unit being installed on site

Units are bolted together on your prepared site

Specifications

Standard 20ft unit

What your engineer and procurement team need to evaluate.

Size
20ft · 3m W × 6m L × 2.8m H
Floor area
18 sqm
Frame
2.3mm galvanized steel
Walls
50mm insulated panels
Roof
40mm glass wool + 0.45mm steel cover
Floor
18mm fire-proof magnesium board
Door
1 steel door
Windows
2 plastic-steel windows
Electrical
Wiring, outlet and lighting included

Process

How your project moves.

  1. 01

    Send your requirements

    Location, intended use, number of units and target date — by form, Messenger, Viber or call.

  2. 02

    Free planning call

    We go over layout, options and site access. Photos or a video of the site help a lot.

  3. 03

    Layout sketch + quotation

    You receive a layout sketch and a written quotation: included, separately quoted and to be confirmed.

  4. 04

    Confirm and schedule

    Once you approve the quotation and terms, production and delivery are scheduled.

  5. 05

    Delivery & installation

    Units are delivered and bolted together on your prepared site, then turned over to you.

Request a quotation

Send your site requirements.

Project location, intended use and headcount, number of units and target date. You’ll get a layout sketch and written scope.

  • Free layout sketch and itemized quotation
  • Free installation · delivery quoted separately
  • One unit or a full site compound

FAQ

Project buyer questions

How much is a prefab unit?

Every project is quoted, because the total depends on size, quantity, options and delivery location. Send your location, intended use and number of units and you will get a written, itemized quotation.

Is installation free? What about delivery?

Installation is free. Delivery is quoted separately based on your exact location and site access, and it is listed as its own line in your quotation.

Can units be joined or stacked?

Yes. Units can be joined side by side into wider rooms, and arranged in 2–3 storey layouts with stairs and walkways, subject to supplier engineering for your site.

Can you handle a full site compound?

Yes. Multi-unit layouts for offices, barracks, toilets and dining areas are planned together, with one point of contact from inquiry to turnover.

What do I prepare on site?

A level, accessible area and a base such as concrete pedestals or footings. Send photos or a short video of the site and I will tell you what to prepare.

How long does it take?

Schedules depend on quantity, configuration and location. Your quotation states the production, delivery and installation timeline for your project.

Do you deliver outside Luzon?

Yes. Units have been delivered to project sites from Luzon to Mindanao, including Mindoro, Bicol and Zamboanga. Send your location to check access.

Mobilizing soon? Start planning your site facilities now.

Send your location, intended use and number of units. You’ll get a free layout sketch and a written quotation.